Austin Bluffs Parkway traffic will be restricted Sept. 6 as crews continue to make progress on the Pikes Peak Regional Transportation Authority-directed widening project.
According to Lawrence Construction, the contractor for the Austin Bluffs widening project, campus community members should anticipate delays from 7 a.m. to 5 p.m. Sept. 6.
Crews will undertake the following actions
- From 7 a.m. to 5 p.m. Sept. 6, the left lane of eastbound Austin Bluffs Parkway from Mallow to Stanton Roads will be closed as crews lay asphalt. All lanes will reopen at 5 p.m.
- From 7 a.m. to 5 p.m. Sept. 6, the right lane of eastbound Austin Bluffs Parkway from the west entract to UCCS to Meadow Lane will be closed as crews lay asphalt. All lanes will reopen at 5 p.m.
- From 7 a.m. to 5 p.m. Sept. 6, the left lane of westbound Austin Bluffs Parkway near Stanton Road will be closed as crews repair a water line. All lanes will reopen at 5 p.m.
For more information about the Austin Bluffs widening project, call the project hotline, (719) 337-2436 or visit www.austinbluffscorridor.com
Leave a Reply