Sections of Austin Bluffs Parkway in front of UCCS will be closed on Saturday, March 29 to accommodate construction.
The right westbound lane between Union and the west entrance of campus will be closed between 7:30 a.m. and 2 p.m. to accommodate concrete work activities on the north side of Austin Bluffs Parkway. All lanes will be reopened to traffic by 2 p.m.
The left turn lane of the Meadow Lane intersection for northbound Austin Bluffs Parkway will be closed between 7:30 a.m. and 2 p.m. for utility work. The left turn lane will reopen to traffic by 3:00 p.m.
Other changes along Austin Bluffs include:
- Left Turn Restriction, Westbound Austin Bluffs Parkway at Brenner Place. The left turn lane at the Brenner Place intersection for westbound Austin Bluffs Parkway will remain closed until Fall 2014 when the Austin Bluffs Parkway median reconstruction is completed.
- Temporary Closure and Traffic Pattern Shift, Westbound Lane of Austin Bluffs Parkway between Turquoise Drive and Barnes Road. The right westbound lane of Austin Bluffs Parkway between Turquoise Drive and Barnes Road will be closed between 7:30 a.m. and 3 p.m., March 29 to accommodate a traffic pattern shift. Following the traffic pattern switch, the left lane of westbound Austin Bluffs Parkway between Turquoise Drive and Barnes Road will be closed for a short period of time. Both westbound lanes will reopen to traffic by 3:00 p.m.
For more information, contact the project hotline, (719) 377-2436 or visit www.austinbluffscorridor.com
Leave a Reply