{"id":4988,"date":"2011-10-19T16:28:56","date_gmt":"2011-10-19T22:28:56","guid":{"rendered":"http:\/\/communique.uccs.edu\/?p=4988"},"modified":"2011-10-19T17:15:50","modified_gmt":"2011-10-19T23:15:50","slug":"shut-the-front-door-new-uc-entrance-nears-completion","status":"publish","type":"post","link":"https:\/\/communique.uccs.edu\/?p=4988","title":{"rendered":"Shut the front door: New UC entrance nears completion"},"content":{"rendered":"<p><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5051.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignright size-medium wp-image-4989\" title=\"DSC_5051\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5051-300x199.jpg\" alt=\"New entrance to UC\" width=\"300\" height=\"199\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5051-300x199.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5051-555x368.jpg 555w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5051.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>As workers welded new handrails into place Wednesday, a\u00a0 second main entrance to the University Center came one step closer to reality.<\/p>\n<p>The handrails are among the final touches to the last piece of a $250,000 summer remodeling project that improved the appearance and function of the University Center\u2019s first floor. For Jeff Davis and Megan Bell, the University Center\u2019s director and associate director, the project to convert a former loading dock to a true second entrance comes none too soon.<\/p>\n<p>Plans call for final construction approval Oct. 26 and a grand opening celebration on Nov. 9. Bell is planning a 3 p.m. to 5 p.m. celebration and promises food, music, a ribbon-cutting ceremony and office open houses to celebrate the long-gestating project.<\/p>\n<p>\u201cWe knew there were utilities in the area,\u201d Davis said. \u201cBut we didn\u2019t know there so many until the digging started. They were all there \u2013 gas, electric, data, telephone, water and sewer &#8212; and right where we didn\u2019t want them to be.\u201d<\/p>\n<p><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/P1010072.jpg\"><img decoding=\"async\" class=\"alignright size-medium wp-image-4990\" title=\"OLYMPUS DIGITAL CAMERA\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/P1010072-300x225.jpg\" alt=\"Underground lines\" width=\"300\" height=\"225\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/P1010072-300x225.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/P1010072-555x416.jpg 555w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/P1010072.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>As contractors began to dig a foundation for a new entrance that would support a 35 foot glass and metal tower, the web of utility lines was discovered. They stood in the way of progress to build a second entrance to the University Center that matched the building\u2019s main entrance and mimicked the architectural style of Centennial Hall.<\/p>\n<p>Faced with a hefty bill to move the utilities, the project was redesigned. Now, instead of a traditional foundation, the tower is supported by piers which go deep into the ground and around the utilities web.<\/p>\n<p>While most campus community members will pay more attention to the aesthetic transformation that brought a rounded set of entry stairs and the signature tower to the building, a solid foundation was necessary before moving forward.<\/p>\n<p>And while clearly frustrated by the delay, Davis is pleased that visitors to the University Copy Center and MOSAIC offices will no longer feel like they are being shuttled through a back door. For in reality, they were.<\/p>\n<p><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5056.jpg\"><img decoding=\"async\" class=\"alignright size-medium wp-image-4992\" title=\"DSC_5056\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5056-199x300.jpg\" alt=\"Grinding\" width=\"199\" height=\"300\" \/><\/a>The roots of the new, second entrance to the University Center can be traced to the late 1970s when the space was occupied by the Kraemer Family Library. What is now an entrance was then a loading dock for books and mail delivered to the university. Though the occupants of the space changed, the loading dock roots remained.<\/p>\n<p>\u201cI\u2019m excited that visitors to MOSAIC and the Copy Center in particular are now going to have an entrance that proudly says \u2018UCCS\u2019 and lets them know they are welcome here,\u201d Davis said. \u201cIt\u2019s been a long time coming.\u201d<\/p>\n<p><em>&#8212; Photos by Tom Hutton, University Advancement, and Jeff Davis, University Center<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>As workers welded new handrails into place Wednesday, a\u00a0 second main entrance to the University Center came one step closer to reality. The handrails are among the final touches to the last piece of a <a class=\"mh-excerpt-more\" href=\"https:\/\/communique.uccs.edu\/?p=4988\" title=\"Shut the front door: New UC entrance nears completion\">(More)<\/a><\/p>\n<\/div>","protected":false},"author":3,"featured_media":4989,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false,"_links_to":"","_links_to_target":""},"categories":[1],"tags":[],"class_list":["post-4988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all"],"jetpack_featured_media_url":"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2011\/10\/DSC_5051.jpg","jetpack_shortlink":"https:\/\/wp.me\/p1mBpJ-1is","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/4988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4988"}],"version-history":[{"count":4,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/4988\/revisions"}],"predecessor-version":[{"id":4995,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/4988\/revisions\/4995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/media\/4989"}],"wp:attachment":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}