{"id":45407,"date":"2018-12-26T12:07:35","date_gmt":"2018-12-26T19:07:35","guid":{"rendered":"http:\/\/communique.uccs.edu\/?p=45407"},"modified":"2018-12-26T12:07:35","modified_gmt":"2018-12-26T19:07:35","slug":"photo-feature-hybl-center-construction-dec-21-2018","status":"publish","type":"post","link":"https:\/\/communique.uccs.edu\/?p=45407","title":{"rendered":"Photo feature: Hybl Center construction &#8211; Dec. 21, 2018"},"content":{"rendered":"<figure id=\"attachment_45415\" aria-describedby=\"caption-attachment-45415\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-45415\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373-750x500.jpg\" alt=\"Site for the Hybl Center\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45415\" class=\"wp-caption-text\">Site for the William J. Hybl Sports Medicine and Performance Center on Dec. 21, 2018.<\/figcaption><\/figure>\n<p>With mild winter conditions, crews working under general contractor J.E. Dunn started leveling the site for the William J. Hybl Sports Medicine and Performance Center. Photos were taken Dec. 21, 2018, with most of the activity in the area between the two old parking lots.<\/p>\n<p>The 104,000-square foot Hybl Center will be the first of its kind to integrate undergraduate and graduate education with clinical practice and research in a sports medicine and performance environment. Penrose St. Francis Centura Health will manage the clinical operations and 1,500 exercise science, human anatomy and physiology students are projected to study in the facility. The project received supplemental funding from the Regional Tourism Act of the Colorado Office of Economic Development and International Trade through the City for Champions initiative.<\/p>\n<figure id=\"attachment_45409\" aria-describedby=\"caption-attachment-45409\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197.jpg\"><img decoding=\"async\" class=\"wp-image-45409 size-large\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197-750x500.jpg\" alt=\"Hybl Center construction\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0197.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45409\" class=\"wp-caption-text\">Groundwork begins on the Hybl Center, with the Lane Center in the background.<\/figcaption><\/figure>\n<figure id=\"attachment_45408\" aria-describedby=\"caption-attachment-45408\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147.jpg\"><img decoding=\"async\" class=\"size-large wp-image-45408\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147-750x500.jpg\" alt=\"Hybl Center construction.\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0147.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45408\" class=\"wp-caption-text\">A construction worker digs into the hillside for construction of the Hybl Center.<\/figcaption><\/figure>\n<figure id=\"attachment_45411\" aria-describedby=\"caption-attachment-45411\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-45411\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273-750x500.jpg\" alt=\"Hybl Center construction\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0273.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45411\" class=\"wp-caption-text\">Work begins on the Hybl Center, with N. Nevada Ave. and University Village Colorado in the background.<\/figcaption><\/figure>\n<figure id=\"attachment_45410\" aria-describedby=\"caption-attachment-45410\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-45410\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219-750x500.jpg\" alt=\"Dirt flying on the Hybl Center construction.\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0219.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45410\" class=\"wp-caption-text\">Dust flies as a construction worker moves dirt for the site of the Hybl Center.<\/figcaption><\/figure>\n<figure id=\"attachment_45412\" aria-describedby=\"caption-attachment-45412\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-45412\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312-750x500.jpg\" alt=\"Hybl Center construction\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0312.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45412\" class=\"wp-caption-text\">A construction worker moves dirt on the site of the Hybl Center.<\/figcaption><\/figure>\n<figure id=\"attachment_45413\" aria-describedby=\"caption-attachment-45413\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-45413\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340-750x500.jpg\" alt=\"Hybl Center constrution with Ent Center in background\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0340.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45413\" class=\"wp-caption-text\">A construction worker levels the site for the Hybl Center, with the Ent Center for the Arts in the background.<\/figcaption><\/figure>\n<figure id=\"attachment_45414\" aria-describedby=\"caption-attachment-45414\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-45414\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347-750x500.jpg\" alt=\"Hybl Center construction from North Nevada Avenue\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347-1400x933.jpg 1400w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0347.jpg 2048w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-45414\" class=\"wp-caption-text\">Hybl Center construction as it looks from N. Nevada Ave.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>With mild winter conditions, crews working under general contractor J.E. Dunn started leveling the site for the William J. Hybl Sports Medicine and Performance Center. <a class=\"mh-excerpt-more\" href=\"https:\/\/communique.uccs.edu\/?p=45407\" title=\"Photo feature: Hybl Center construction &#8211; Dec. 21, 2018\">(More)<\/a><\/p>\n<\/div>","protected":false},"author":10,"featured_media":45415,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false,"_links_to":"","_links_to_target":""},"categories":[1,50,13],"tags":[44,143,279],"class_list":["post-45407","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all","category-health-and-wellness","category-photo-features","tag-administration-and-finance","tag-facilities-services","tag-william-j-hybl-sports-medicine-and-performance-center"],"jetpack_featured_media_url":"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/12\/IMG_0373.jpg","jetpack_shortlink":"https:\/\/wp.me\/p1mBpJ-bOn","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/45407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=45407"}],"version-history":[{"count":2,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/45407\/revisions"}],"predecessor-version":[{"id":45424,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/45407\/revisions\/45424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/media\/45415"}],"wp:attachment":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=45407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=45407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=45407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}