{"id":33450,"date":"2018-07-19T08:17:02","date_gmt":"2018-07-19T14:17:02","guid":{"rendered":"http:\/\/communique.uccs.edu\/?p=33450"},"modified":"2018-07-27T08:30:56","modified_gmt":"2018-07-27T14:30:56","slug":"city-road-work-to-impact-traffic-near-regent-circle-and-meadow-lane","status":"publish","type":"post","link":"https:\/\/communique.uccs.edu\/?p=33450","title":{"rendered":"Update: City road work to impact traffic near Regent Circle and Meadow Lane"},"content":{"rendered":"<figure id=\"attachment_33458\" aria-describedby=\"caption-attachment-33458\" style=\"width: 740px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-33458\" src=\"http:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction-750x500.jpg\" alt=\"Construction sign at UCCS in 2013\" width=\"740\" height=\"493\" srcset=\"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction-750x500.jpg 750w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction-300x200.jpg 300w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction-768x512.jpg 768w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction-150x100.jpg 150w, https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction-1400x933.jpg 1400w\" sizes=\"(max-width: 740px) 100vw, 740px\" \/><\/a><figcaption id=\"caption-attachment-33458\" class=\"wp-caption-text\">Construction sign at the Meadow Lane roundabout from September 2013<\/figcaption><\/figure>\n<p><em>July 27, 2018 update: <\/em>Because of\u00a0recent storm activity, the City of Colorado Springs road crew assigned to repair the asphalt at the Regent Circle and Meadow Lane roundabout were reassigned to storm cleanup. The city has rescheduled this work for July 30-31 from 7:30 a.m. to 4 p.m. The road will be shut down to one lane of traffic, with flaggers moving small vehicles through the construction area. Parking in Lot 220 will be unaffected and crews will be at crosswalks to assist pedestrians crossing Regent Circle.<\/p>\n<p><em>July 19, 2018 original post:\u00a0<\/em>The City of Colorado Springs will conduct road work on Regent Circle July 23-25 between Meadow Lane and Cragmor Village Road. The road will be shut down to one lane of traffic July 23 and 24 with flaggers moving small vehicles through the construction area. July 25 is being reserved if work isn&#8217;t completed in the first two days.<\/p>\n<p>Parking in Lot 220 will be unaffected, and crews will be at crosswalks to assist pedestrians crossing Regent Circle. Work will start at 7:30 a.m. each morning and conclude at 4 p.m. each afternoon. Internal campus shuttle buses to University Hall will be detoured onto Austin Bluffs Parkway and could see longer travel times, especially in the eastbound direction.<\/p>\n<p>City crews will mill and pave the westbound lanes of Regent Circle from Cragmor Village Road to the Meadow Lane roundabout and do additional work in the roundabout. The work is being done to address general repair<\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>The City of Colorado Springs will conduct additional road work on the roundabout at Regent Circle and Meadow Lane July 30-31. <a class=\"mh-excerpt-more\" href=\"https:\/\/communique.uccs.edu\/?p=33450\" title=\"Update: City road work to impact traffic near Regent Circle and Meadow Lane\">(More)<\/a><\/p>\n<\/div>","protected":false},"author":10,"featured_media":33458,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false,"_links_to":"","_links_to_target":""},"categories":[1],"tags":[44,143],"class_list":["post-33450","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all","tag-administration-and-finance","tag-facilities-services"],"jetpack_featured_media_url":"https:\/\/communique.uccs.edu\/wp-content\/uploads\/2018\/07\/meadow-lane-construction.jpg","jetpack_shortlink":"https:\/\/wp.me\/p1mBpJ-8Hw","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/33450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33450"}],"version-history":[{"count":6,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/33450\/revisions"}],"predecessor-version":[{"id":33734,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/posts\/33450\/revisions\/33734"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=\/wp\/v2\/media\/33458"}],"wp:attachment":[{"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/communique.uccs.edu\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}